The Ulu Padas Hydroelectric Dam, which is expected to be completed in 2029 with a cost of RM4 billion, has a power supply capacity of 187.5 megawatts. A study is underway for a water supply of 6,000 million litres per day.
Shouldn’t it be “at a cost of RM4 billion” instead?
Thanks.